Environment Canada Toronto Weather
July 24, 2008 9:39 PM EST

LINK Train

The new LINK Train offers free transportation between Terminal 1, Terminal 3, and the Sheraton Gateway Hotel. It also provides access to the Reduced Rate Parking Lot at Viscount Station, and the employee parking lot. The train runs 24 hours a day, seven days a week, and is wheelchair accessible. You can access the train from the following locations:

  • Terminal 1 – located on Level 5 of the Terminal 1 Parking Garage, accessible from the terminal via the West Pedestrian Bridge
  • Terminal 3/Sheraton Gateway Hotel – accessible via the terminal/hotel pedestrian bridge, either from the hotel lobby or Level 3 of Terminal 3
  • Reduced Rate Parking Lot/Employee Parking Lot – accessible from the Viscount Station, located between Viscount and Airport Roads at American Drive .